U.S. Army equips AMPV with 30mm cannon for armored units

The United States Army has delivered its first Armored Multi-Purpose Vehicle (AMPV) equipped with a 30mm cannon to the 1st Cavalry Division, marking the initial fielding of a more heavily armed variant of the platform, the division confirmed in a recent announcement. The first new combat vehicles ha

Defence Blog
75
1 мин чтения
0 просмотров

The United States Army has delivered its first Armored Multi-Purpose Vehicle (AMPV) equipped with a 30mm cannon to the 1st Cavalry Division, marking the initial fielding of a more heavily armed variant of the platform, the division confirmed in a recent announcement. The first new combat vehicles have been received by the division’s units as […]

Оригинальный источник

Defence Blog

Поделиться статьей

Похожие статьи

India conducts first salvo launch of new NASM-SR Missile
🔬Weapons & Technology
Naval News

India conducts first salvo launch of new NASM-SR Missile

India’s Defence Research & Development Organisation (DRDO) and Indian Navy have successfully conducted the maiden salvo launch of Naval Anti-ship Missile-Short Range (NASM-SR) on April 29. The missiles were launched from the Navy’s Sea King Mk.42B helicopter off the coast of Bay of Bengal.

около 2 часов назад3 min
Canadian Coast Guard Launches its first of two Arctic and Offshore Patrol Ships
🔬Weapons & Technology
Naval News

Canadian Coast Guard Launches its first of two Arctic and Offshore Patrol Ships

On 29 April, 2026, in Halifax, Nova Scotia, the Canadian Coast Guard celebrated the launch of the Canadian Coast Guard Ship (CCGS) Donjek, the first of two Arctic and Offshore Patrol Ships being built for the Canadian Coast Guard at Irving Shipbuilding Inc., as part of the National Shipbuilding Stra

около 12 часов назад3 min
🔬
🔬Weapons & Technology
USNI News

Navy’s Modest $602M Unfunded Request Includes 6 Military Construction Projects

Behind a record-breaking $1.5 trillion Pentagon budget request, the Navy’s unfunded wish list focused on a handful of military construction projects, according to the document reviewed by USNI News. The $602 million unfunded priority list leads with $50 million for a 16,118 square foot facility at N

около 16 часов назад1 min
Royal Navy: Atlantic Bastion timeline, 2026-2029
🔬Weapons & Technology
Naval Technology

Royal Navy: Atlantic Bastion timeline, 2026-2029

The First Sea Lord, General Gwyn Jenkins, detailed the next steps in delivering the navy’s future force structure. The post Royal Navy: Atlantic Bastion timeline, 2026-2029 appeared first on Naval Technology.

около 16 часов назад1 min