Lockheed Martin has begun final assembly of the first F-35A Lightning II fighter jet destined for the German Air Force at its Fort Worth, Texas production facility. The airframe has entered final assembly with its major structural components joined and positioned for installation of critical systems. The F-35A program is intended to provide the Luftwaffe […]
Lockheed begins final assembly of Germany’s first F-35A fighter
Lockheed Martin has begun final assembly of the first F-35A Lightning II fighter jet destined for the German Air Force at its Fort Worth, Texas production facility. The airframe has entered final assembly with its major structural components joined and positioned for installation of critical systems